PROJECT OVERVIEW
RayGen’s project proposes a power plant with renewable electrical capacity of 4MWAC and 50MWh storage delivered through a 5MW grid connection. It is budgeted to cost A$25 million and will be constructed and commissioned ready for operation in July 2022. The project will connect to the 22kV transmission line and feed into Red Cliffs Terminal Station.
The project will demonstrate two new technologies (PV Ultra & Thermo Hydro), that, combined, aim to disrupt the economics of solar-plus-storage while offering improved grid security and reliability.
The system is an Australian innovation that is designed and manufactured in Victoria. RayGen is considered a leader in technology innovation, having received a world record for solar system efficiency in 2014 in partnership with the University of New South Wales.